Benefits:
5 to 7 minute per plug mill times using a 5-blade mill, standard time is 20 minutes per plug for the competitor’s plug.
5 to 7 minute per plug mill times using a 5-blade mill, standard time is 20 minutes per plug for the competitor’s plug.
Multi-stage completions utilizing composite frac plugs, wanting to use less water and reduce risk.
The entire operation was seamless, and the ROGUE operated perfectly both during the frac and during mill out.
PetroFrac Oil Tools launched its newest composite frac plug, the ROGUE™, in February 2019 at the Hydraulic Fracturing Technical Conference (HFTC) in the Woodlands. This new plug is the shortest on the market and utilizes a unique flapper isolation device to isolate stages during multistage stimulation.
A major shale operator operating in the Montney formation of Alberta, had a 50 stage, extended reach wellbore that was over 22,900 ft. of total depth (TD). The well, 4.5”, 13.5 lb, TN-125 HC casing, was experiencing issues with competitor’s plugs slipping due to mechanical properties of casing, and wireline tension issues.
Overall, the ROGUE program saw a 25% reduction in pump down volumes as compared to previous plugs. The entire operation was seamless, and the ROGUE operated perfectly both during the frac and during mill out.
Texas (Corporate)
20520 Stokes Road,
Waller, TX 77484
Phone: 936.931.0100
Fax: 936.931.0200
Louisiana
228 Thruway Park Road,
Broussard, LA 70518
Phone: 337.385.5395
Fax: 337.385.5255