Case Studies

Project Zonal Isolation

Highlights: The installation went as planned with all packers set at the correct depth and the liner hanger tested. One week after the installation the bottom two APCV™ sliding sleeves were shifted open to provide communication to the reservoir. The upper completion with the ESP was then run and the well is now successfully producing. [...]

READ MORE »

We’ve run almost 5000 APCV-II™ sliding sleeves around the world

Highlights: The state-of-the-art Annular Production Control Valve (APCV-II™) is a sliding sleeve mounted in the production tubing, controlling communication between the annulus and the tubing. In vertical wells or wells with low deviation, the internal sleeve can be shifted with either PetroQuip’s “PB” shifting tool or industry standard Model “B” shifting tool. In highly deviated [...]

READ MORE »

ROGUE™ Composite Frac Plug exceeds expectations in a 65-stage Spraberry well in the Permian Basin

Benefits: Operator was able to complete the well with a 25% reduction in pump down volumes. Challenge: A major operator completing a spraberry well in the Permian Basin, had a two-well zipper frac; running a competitor plug in one well and the PetroFrac ROGUE in the other. Solution: Average drill out time 6.6 minutes Less [...]

READ MORE »

New ROGUE™ Composite Frac Plug performs perfectly for 50 stages in a 22,900 ft well in the Montney Formation

Benefits: 5 to 7 minute per plug mill times using a 5-blade mill, standard time is 20 minutes per plug for the competitor’s plug. Challenge: Multi-stage completions utilizing composite frac plugs, wanting to use less water and reduce risk. Solution: The entire operation was seamless, and the ROGUE operated perfectly both during the frac and [...]

READ MORE »

PetroFrac Oil Tools ShortSTAK enabled operator to reduce operational cost and deliver reliability with less risk

Benefits: Operator was able to complete the well with less water volume, saving $3,000 per stage. Challenge: Multi-stage completions utilizing composite frac plugs, wanting to use less water and reduce risk. Solution: PetroQuip’s ShortSTAK Flapper Composite Frac Plug increases reliability and reduces risk. Details: PetroFrac delivered the ShortSTAK Flapper OAL 7” composite frac plug, utilizing [...]

READ MORE »

PetroQuip’s PASS™ Tool successfully operates after unexpected temporary abandonment

Benefits: Reduced risk and cost associated with additional wireline trip to bring well on production. Challenge: One year of temporary abandonment Solution: PetroQuip’s innovative PASS Tool and APCV III for reliable remote operation Details: A Major Gulf of Mexico operator installed PetroQuip’s Pressure Actuated Sliding Sleeve or PASS™ Tool along with PetroQuip’s industry leading Annular [...]

READ MORE »

LOCATIONS

Texas (Corporate)
20520 Stokes Road, Waller, TX 77484 
Phone:  936.931.0100
Fax: 936.931.0200

Louisiana
228 Thruway Park Road, Broussard, LA 70518
Phone: 337.385.5395
Fax: 337.385.5255

PetroQuip Energy Services