Toe Sub

The  PetroQuip Toe Sub eliminates the need for Tubing Conveyed Perforating (TCP) toe prep by providing a simple and reliable hydraulically actuated injection path. The Toe Sub can be pressure tested multiple times below the activation pressure.

  • Multiple low-pressure tests can be applied prior to opening
  • Open upwards and held in open position by three means:
  • Snap ring
  • Hydraulic pressure
  • Morse taper
  • Each toe valve configured to suit well application
  • Large flow area
  • Opening pressure not affected by well bore pressure
  • Optional ball seat, which allows for DFIT to be performed
  • Absolute pressure rating 22,000 psi
Liner Size OD ID Length Flow Port Area Rupture Disc Increments Threads Tensile
(in) (in) (in) (in.) (in2) (psi) (ksi) (lbs)
3.5 4.250 2.450 35.3 7.1 500 110 183,000
4.5 5.875 3.755 37.8 18.6 500 140 248,750
4.5 5.500 3.250 37.5 16.3 500 125 285,000
5.5 7.250 4.015 38.4 23.6 500 140 459,375
5.5 7.250 4.776 38.4 23.6 500 140 459,375
5.5 6.875 4.270 38.4 23.6 500 140 387,500

LOCATIONS

Texas (Corporate)
20520 Stokes Road, Waller, TX 77484 
Phone:  936.931.0100
Fax: 936.931.0200

Louisiana
228 Thruway Park Road, Broussard, LA 70518
Phone: 337.385.5395
Fax: 337.385.5255

PetroQuip Energy Services